Source

The world’s purest water isn’t found on earth.  It’s found above it.

Our story starts 10,000 meters into the atmosphere. Using advanced water-capture technology, we can extract untouched water vapor from the air to create the purest drinking water you can find at surface level.

Every bottle of water we collect is infused with essential minerals for the highest-quality taste profile, and tested to ensure the smoothest drinkability.

It’s water perfected.

Stand out with SOURCE water, capturing customer’s attention as the only brand on the shelf whose water is local, premium, and sustainable.

Source Hydropanels

  • SOURCE Hydropanels create clean, reliable drinking water from sunlight and air – 100% off-grid
  • SOURCE Hydropanels have been installed in 23 countries worldwide
  • Cloud juice water now finances installations through a Water Purchase Agreement “WPA” in select jurisdictions
  • No upfront capex required – WPA converts SOURCE Water to a per liter operating expense with no money down

How Does Source Work?

1. Using solar PV, SOURCE takes in ambient air via fans and collects pure water vapour from that air onto a hygroscopic material

3. The pure water flows into the 30-litre reservoir where it is mineralized with magnesium and calcium

2. With heat from the sun, SOURCE converts water vapour collected into pure, liquid water

4. Sensors inside the reservoir monitor and optimize the water to maintain quality

Source Water Quality

  • The world’s leading premium, renewable water is now available on a per liter, unitized basis
  • Cloud juice Water tests SOURCE drinking water using an expansive list of US and International Guidelines
  • Sterilization and mineralization process that maintains high-quality of drinking water
  • SOURCE is the world’s most technologically advanced water- no contaminants, ever

Water Purchase Agreement

Financing your transition to the world’s most technologically advanced water

How it works:

  • Tell us how many liters of drinking water you are consuming. We will then size a SOURCE array based on your drinking water requirements and let you know how much space we’ll need
  • We install a SOURCE Hydropanel array at our cost
  • We handle shipping, installation and ensure the Hydropanels perform optimally, by taking care of any spare parts and maintenance needed
  • You purchase SOURCE water at a fixed price per liter and agree to purchase everything we produce, over a contract period of 5 to 15 years

Key benefits:

  • According to World Economic Forum & World Bank, by 2030, global shortfall of 40% in available clean drinking water; expected to intensify due to: population growth, urbanization, depletion of groundwater, water infrastructure mismanagement, pollution.
  • Cloud juice Water  provides customers with a reliable, low-cost water supply without requiring up-front capital investment. Our price / liter is often less than what you’re currently paying
  • We assume all technology risk; operations and maintenance is covered in our pricing. No surprise fees. Maintained by our experts, providing predictable & contracted water costs for customers
  • We manage bi-annual water testing and comply with local drinking water regulations.
  • The hyper-local and decentralized structure drastically improves CO2 outcomes associated with bottled water transportation and delivery, not to mention SOURCE is the only drinking water that is renewable by definition.

Source Pricing (Low Volume)

  • Off-takers are required to provide the last three years’ audited financial statements
  • Company registration documents
  • Execution of our standard Water Purchase Agreement contract
Land Usage

 (sqm for minimum daily consumption)

Starting Price* (USD/litre) Minimum Daily Consumption (litres)

 

Contract Structure
5-Year Offtake 800 sqm $0.50/litre

 

600 Take or Pay
10-Year Offtake 800 sqm $0.40/litre 600 Take or Pay
15-Year Offtake 800 sqm $0.29/litre 600 Take or Pay

Source Pricing (High Volume)

  • Off-takers are required to provide the last three years’ audited financial statements
  • Company registration documents
  • Execution of our standard Water Purchase Agreement contract
Offtake Period (years) Land Usage

 (Hectares)

Starting Price* (USD/litre) Estimated Monthly Consumption (litres)

 

Contract Structure
5 4-6 $0.35

 

1m Take or Pay
10 4-6 $0.30 1m Take or Pay
15 4-6 $0.25 1m Take or Pay

Source  for Private Label Bottling

Reduce plastics + high quality alternative + higher margins than leading premium brands.

  • Responsibly packaged offering (glass, aluminum, etc.)
  • Either line extension (premium addition) to existing PL water or new brand
  • Bottling near major distribution centers; can replicate the exact same water anywhere
  • Potential for portion of proceeds to go to charitable community projects

Source Production Example – Private Label

Figures based on forecast 15-year water production from 10,000 SOURCE Hydropanels:

 

  • 1,277 liters produced per SOURCE Hydropanel annually
  • 12.8 Million liters produced per year across array
  • = 950 Million 750ml bottles
  • 192 Million liters produced over project lifetime

CO2 Outcomes – Private Label

Figures based on forecast 15-year water production from 10,000 SOURCE Hydropanels:

 

  • 500 Million plastic water bottles displaced
  • 589,600 tons of carbon dioxide emissions avoided*
  • 950 Million responsibly packaged bottles (750ml) produced

Source Project Development Process

Consultation Stage

  • Identification and assessment of the opportunity and proposed project location
  • Cloud juice Water analyses current drinking water consumption

Proposal Stage

  • Cloud juice Water conducts the feasibility study for SOURCE WPA Project
  • Acceptance of proposal by off-taker

WPA Stage and Project Execution

  • WPA off-take agreement negotiation
  • Signing WPA

Cloud Juice Water and Source Partners